COmmercial Civils Projects

Dinas Lane, Huyton, Liverpool - EXTERNAL WORKS PACKAGE

Scope: Site Strip, Install new drainage, services, artifical grass, fencing, wet pour tarmac, access steps, block paved perimeter

Contract Period: 10 Weeks

Backyard with grass, shrubs, a birdbath, a fence, and a brick house with windows, a roof with skylight, and chimney.
A narrow concrete driveway with grass growing through the cracks, flanked by wooden fences on both sides, leads to a parked black car at the end, with houses visible in the background on a cloudy day.
Backyard of a house with a lush green lawn, a wooden fence, and a house featuring a tiled roof, large black-framed windows, and a black door.
A newly paved driveway with a gravel texture, bordered by a grey brick edge on the left and a wooden fence along the right, with neighboring houses and a few trees in the background under a partly cloudy sky.

Ormskirk District & General Hospital - Endoscopy Ward EXTERNAL WORKS

Scope: Site Strip, Internal/External Drainage, Service Ducting, Paving, Pedestrian Ramp, Handrail, Kerbing, Line Marking, Tarmac

Contract Period: 20 Weeks

Construction site with a small yellow excavator, workers, and a partially completed wooden building, enclosed by metal barriers, under a partly cloudy sky.
Sidewalk with a building featuring wooden paneling on the left side and a parking lot with painted spaces on the right, bordered by a metal railing, outdoors on a sunny day with a clear blue sky and trees in the background.
A building under construction with a wheelchair ramp leading to its entrance, surrounded by a parking lot with several vehicles and construction workers, under a blue sky with some clouds.
Empty parking lot with yellow handicap parking lines and signs, next to a wooden building and surrounded by trees.

SOUTHPORT & ORMSKIRK HOSPITAL NHS TRUST - Health and Wellbeing Garden refurbishment.

Scope: Demolition existing garden area. Install new drainage, soft and hard surfaces including resin mulch. Create and install bespoke timber features/borders

Contract Period: 7 Weeks

A view looking down into a courtyard surrounded by a brick apartment building with multiple windows, featuring a winding pathway, trees, and plants.
A modern brick building with several windows, a tree in a large planter, and purple flowers in a courtyard.
A ribbon-cutting ceremony with a man in a white shirt and a woman in blue scrubs, holding a large pair of scissors, surrounded by people in an outdoor courtyard with yellow flooring.

Ormskirk District & General Hospital - Physiotherapy Refurbishment EXTERNAL WORKS

Scope: Site Strip, Internal/External Drainage, External Extension, Service Ducting, Paving, Pedestrian Ramp with Gabion Wall, Handrail, Kerbing, Line Marking, Resin Bound Gravel, Lighting Columns

Contract Period: 18 Weeks

A freshly paved concrete pathway with metal railings in a residential outdoor area at sunset.
Construction site with a pathway, metal safety railing, a stone retaining wall, and machinery in the background, under a cloudy sky.
Parking lot with cars parked on an elevated area behind a rock wall, accessible stairs and rails, surrounded by trees and clear blue sky.
Newly constructed sidewalk with a metal handrail, adjacent to a grassy area and parking lot with several cars, under a cloudy sky.
Parking lot with cars on a raised level behind a rock wall, under a blue sky with green trees.

Immingham Docks (The Port of Immingham) East Coast

Scope: Installation of new Infrastructure to enhance a Port Terminal including 2km of Service Ducting, Surfacing, Concrete foundations

Contract Period: 40 weeks

Construction work on a dock with a large cargo ship nearby. A small orange excavator is breaking up the pavement, with debris on the ground. The ship is tied to the dock with ropes, and there are construction cones and barriers around the area.
Construction worker using a mini excavator to dig a shallow trench in a parking lot by a green fence, with traffic visible in the background.
Construction work with a small yellow excavator near a parking lot and a body of water. The excavator has the logo of BP Groundworks Ltd on its side.
Construction workers working on rebar reinforcement for a concrete slab at a construction site. Equipment and materials are visible, with industrial structures in the background and cloudy skies overhead.
Stacks of black corrugated drainage pipes with green interiors stored outdoors in front of a concrete wall, on a parking lot. A cardboard box labeled Trelleborg is near the pipes.

EVERTON FC - Training Complex Electrification.

Scope: Installation of twin wall plastic ductile pipe in readiness to receive electrification to power additional lighting columns as part of the complex expansion and upgrade. Working closely with the Client and site logistics team to ensure minimal disruption to daily operations of the site.

Contract Period: 5 Weeks

Construction workers operating a small excavator digging a trench in a grassy area, with large dirt piles and pipes nearby, under a partly cloudy sky.
Underground utility pipes installed along a grassy landscape next to a paved pathway, with trees and cloudy sky in the background.

The Gleddings Preparatory School, Halifax

Scope: Site Strip, Subbase, Preparation & Resin Mulch Surface installation

Contract Period: 2 weeks

Wooden playground structure with a metal slide outdoors on a cloudy day, surrounded by a black metal fence and trees in the background.
Children's outdoor playground with a slide, climbing structures, wood logs, and fencing, with two adults in safety vests talking nearby.
Outdoor playground with wooden climbing structure, surrounded by trees and a black metal fence.
Outdoor play area with wooden sandbox and a wooden bug hotel, enclosed by a black metal fence, with trees and open field in the background.

Hednesford Town Football Club - New Pitch

Scope: Site Strip, Installation of pitch perimeter services & drainage, support specialist Pitch Install, Mass Muck Disposal, Concrete Plinths for Advertisement boards,

Contract Period: 10 weeks

Construction work on a sports stadium field with a yellow CAT excavator and workers in orange vests, surrounded by construction equipment and materials, with empty spectator seats and houses in the background.
An excavator on a hill of dirt, with trees and a building in the background, under a clear blue sky.
Construction site of a football stadium with a seating area, construction vehicles, and open ground under clear blue sky.
View of a sports stadium with a worked-on seating area, a clock, and a groundworks van in the foreground.
Empty football stadium with green grass field, covered seating area, and surrounding houses under a blue sky. Shadow cast on the field.

Everton Football Club - New Stadium - Rugbys Post Sockets

Scope: Installation of new Rugby Post Sockets

Contract Period: 2 weeks

Construction equipment on a football field, including a mini excavator digging a hole, surrounded by orange safety barriers and metal fence panels, with stadium seats in the background.
View of a stadium entrance with blue stadium seats, a concrete and metal ramp leading into an enclosed area, with black rubber mats on the ground, and stairs on the right side.

Fleetwood FC - Land Drains

Scope: Installation of new Land Drains approx 3000m

Contract Period: 4 weeks

Chambers Road - EXTERNAL WORKS

Scope: Site Strip, New Fencing, Paving, Fencing, Drainage, Soft Landscaping, Sleeper Bin Store, Tarmac Surfacing, Line Marking

Contract Period: 6 weeks

WWT Martin Mere, Lancashire - Play Area

Scope: Site Strip, New Bespoke Concrete Water Feature, MOT Subbase, Concrete Monds, Wet Pour Resin, Fencing

Contract Period: 5 weeks

Runcorn Rowing Club - Car Park

Scope: Site Strip, install MOT subbase, install GeoGrid, finish with gravel

Contract Period: 2 weeks

Ormskirk District & General Hospital - Laundry Refurbishment - Internal Civils Package

Scope: New SW & FW Drainage 100mm dia to 225mm dia

Contract Period: 5 weeks

Ormskirk District & General Hospital - Laundry Refurbishment - Internal Civils Package

Scope: Concrete Plinths for Industrial Washing/Drying Machines

Contract Period: 3 weeks

Ormskirk District & General Hospital - Laundry Refurbishment - External Civils Package

Scope: Site Strip, Demolition, New SW & FW Drainage, Attenuation Tank, Bespoke Transformer bases, Paving, Surfacing, New Gas Main, New Combined Sewer Main with PCC Manholes, Soft Landscape with Gravel

Contract Period: 12 weeks

B&M Bargains Distribution Centre, Liverpool

Scope: Installation of Service Ducting through existing concrete raft

Contract Period: 2 weeks

Rowan Park School, Liverpool

Scope: Landscaping to create new footpaths ahead of new play equipment & refurbishment of Hoggin pathways

Contract Period: 2 weeks

Ormskirk District General Hospital - Electrification Upgrades

Scope: Demolition of existing transformer base, shuttering, steelwork, pour new concrete transformer base. Installation of new Switch Room concrete base.

Contract Period: 3 weeks